SVC / 04 — Estimation & Take-Offs

Bid-Stage Take-Offs, Modeled For Win-Rate.

Quantified material and labor models built from architectural drawings — competitive, defensible, and traceable down to the line-item.

Section 02 / Scope

Engineering Scope

SCOPE / 01

Quantified Take-Offs

Line-item material extraction with sheet-good yield modeling, edge-band lineal calc, and hardware rollups.

SCOPE / 02

Labor-Hour Modeling

Shop hours estimated against your historical productivity data and tooling cycle times — not generic industry averages.

SCOPE / 03

Markup & Margin Modeling

Configurable overhead, profit, and contingency layers with full bid-sheet exports.

SCOPE / 04

Value Engineering

Alt-material, alt-construction, and alt-hardware substitutions modeled side-by-side for client negotiation.

Next Step

Open a project brief — receive fixed pricing in 48 hours.

Contact Desk