SVC / 04 — Estimation & Take-Offs
Bid-Stage Take-Offs, Modeled For Win-Rate.
Quantified material and labor models built from architectural drawings — competitive, defensible, and traceable down to the line-item.
Section 02 / Scope
Engineering Scope
SCOPE / 01
Quantified Take-Offs
Line-item material extraction with sheet-good yield modeling, edge-band lineal calc, and hardware rollups.
SCOPE / 02
Labor-Hour Modeling
Shop hours estimated against your historical productivity data and tooling cycle times — not generic industry averages.
SCOPE / 03
Markup & Margin Modeling
Configurable overhead, profit, and contingency layers with full bid-sheet exports.
SCOPE / 04
Value Engineering
Alt-material, alt-construction, and alt-hardware substitutions modeled side-by-side for client negotiation.
Next Step
